The 4 Day Work Week |
30 Comments | |
| By Aaron Newton in Green Living, How To | September 20, 2007 | ||

The notion of our standard work week here in America has remained largely the same since 1938. That was the year the Fair Labor Standards Act was passed, standardizing the eight hour work day and the 40 hour work week. Each Monday, Tuesday, Wednesday, Thursday and Friday workers all over the country wake up, get dressed, eat breakfast and go to work. But the notion that the majority of the workforce should keep these hours is based on nothing more than an idea put forth but the Federal government almost 70 years ago. To be sure it was an improvement in the lives of many Americans who were at the time forced to work 10+ hours a day, sometimes 6 days of the week. So a 40 hour work week was seen as an upgrade in the lives of many of U.S. citizens. 8 is a nice round number; one third of each 24 hour day. In theory it leaves 8 hours for sleep and 8 hours for other activities like eating, bathing, raising children and enjoying life. But the notion that we should work for 5 of these days in a row before taking 2 for ourselves is, as best I can tell, rather arbitrary.
The idea of a shorter work week is not a new one to anyone old enough to have lived through the energy shocks of the 1970’s. It should be fairly obvious to anyone interested in conserving oil that reducing the number of daily commutes per week would reduce the overall demand for oil. There are about 133 million workers in America. Around 80% of them get to work by driving alone in a car. The average commute covers about 16 miles each way. So let’s stop and do some math:
133,000,000 workers X 80% who drive alone = 106,400,000 single driver commuter cars each day.
106,400,000 X 32 miles round trip = 3,404,800,000 miles driven to work each day
3,404,800,000 / 21 mpg (average fuel efficiency) = 162,133,333 gallons of gasoline each day
Each barrel of crude oil produces, on average, 19.5 gallons of gas. (It is important to note that other products like kerosene and asphalt are produced from that same barrel)
162,133,333 / 19.5 = 8,314,530 barrels of oil each day.
What this shows is the impact a 4 day work week could have on crude oil imports. I’m talking about a 40% reduction in the amount of oil we need Monday through Friday simply by rearranging our work week. No wonder this idea was utilized in the 70’s.
But the clear fact that a 4 day work week would save such a precious non-renewable resource is just the first of 16 reasons why I think it’s time to revive the idea of reducing the numbers of days we work each week.
Reason #2 The 4 Day Work Week would reduce greenhouse gas emissions and other air pollutants.
As you pull out of your driveway on your way to work your automobile has already begun to emit Carbon Monoxide, Carbon Dioxide, Sulphur Dioxide, Nitrogen Oxides, Hydrocarbons, Ozone, particulates, Lead and Chlorofluorcarbons. Some of these compounds are responsible for the greenhouse effect that is warming our planet and throwing our global climate system into increasing instability. Others of them contribute to air pollution that causes everything from dramatically rising rates of childhood asthma to cancers, heart disease and respiratory illnesses. Sometimes I drive to work too, so don’t think the whole thing is your fault. But it’s true that we’re playing fast and loose with our ecosystem and poisoning ourselves with our autos. 60 – 70% of urban air pollution is caused by cars. Taking 20% of them off the roads during the most heavily traveled time of the day would obviously reduce the overall amount of pollutants produced by our autos. And this is key, if a worker transitions to a 4 Day Work Week and then spends all day off driving around when he or she would have be at work, then the savings in terms of fuel and pollution will be lost. This is not a plan to provide everyone with more time to drive around but a plan to bring people back into their homes and their local communities. It’s an effort to give them more time with family, more time to exercise, more time to write the great American novel or learn to keep bees, or get another degree, or start a garden.
Reason #3 The 4 Day Work Week would reduce workers exposure to pollutants.
A recent study by the California EPA says “50% of a person’s daily exposure to ultra fine particles (the particles linked to cardiovascular disease and respiratory illnesses) can occur during a commute.” A report by the Clean Air Task Force in 2007 found diesel particle levels were between 4 to 8 times higher in commute vehicles than in the surrounding air. It makes sense when you think about it. The pollution coming from the tailpipe of a vehicle is mostly likely to affect you while you’re sitting directly behind it, especially if you’re stuck in slow moving traffic where the concentrations of such particles can build up.
Reason #4 The 4 Day Work Week would mean less traffic congestion.
Rush hour exists because everyone needs to get to work at about the same time. Anyone who’s lived in a city of size can tell you that early in the morning and late in the afternoon the roads fill up. The average 16 mile commutes takes 26 minutes each way. That’s 52 minutes a day traveling at roughly 35 miles per hour. Imagine if 1/5 of the cars suddenly disappeared? If the work week was staggered so that 1/5 of all workers took a different day off, the U.S. commuter would see a 20% reduction in rush hour congestion without building a single new road. Which leads nicely to the next reason…
Reason #5 The 4 Day Work Week would reduce money spent on new road construction and existing road maintenance.
With 1/5 few cars making the commute each day, fewer new road projects would be necessary and existing roads would last longer with less maintenance. This is not to say that we shouldn’t take advantage of this cost savings to invest in alternative transportation systems. In fact it’s the opposite. This could be a gift to the tax payer who would receive new and better options for travel without any rise in taxes.
Reason #6 The 4 Day Work Week would result in a reduction in personal expenses.
From www.ridetowork.org,
“2002 annual household private vehicle expense is $7,371. This is divided into $3,665 for vehicle purchases, $1,235 for gas and oil and $2,471 for insurance and misc.”
If workers used there cars 20% less often to drive to work, they would see a reduction in the frequency of oil changes, tune ups and the purchase of new tires just to name a few savings. The above numbers also reflect the price of gasoline in 2002. We all know it has increase since then and will continue to increase now that global oil production has peaked. Remember those 162,133,333 gallons of gas we’re going to save?
162,133,333 X $2.75 per gallon = $445,866,665.00
This would save US workers a lot of money! And because our cars would be driven less frequently, they wouldn’t need to be replaced as often. That’s not to say that would shouldn’t try to replace inefficient older cars with more efficient new ones, but this could give the auto manufactures time to wake up to the global peak in oil production and make changes in the types of vehicles they offer. It could also give communities time to respond with planning strategies that favor other types of transportation including walking, biking and mass transit.
Reason #7 The 4 Day Work Week would mean fewer auto accidents each year.
I don’t have statistics on the number of automobile related deaths and injuries that occur specifically during rush hour but almost every radio station on the dial offers a regular update of car crashes throughout each morning and evening commute. It seems safe to assume that fewer cars on the road during those periods of time would result in fewer accidents and the injuries that result from them.
Reason #8 The 4 Day Work Week would mean less time spent in VSC or Voluntary Solitary Confinement
Now some people tell me the time they spend alone in their car is relaxing. Personally I think if that’s true then what those people are really enjoying is time alone on uncongested roads. Rush hour on a busy street is not relaxing. Personal time away from other people can be a positive experience. But we don’t have to spend our time alone in a metal box burning nonrenewable resources that heat the planet. If less time was spent commuting each week, people would have more time for themselves to enjoy, even if they wanted to enjoy that time alone. It seems to me that as a nation we are experiencing an epidemic of disconnect. Ever see those people early in the morning on their way to work at 6:30am talking on their cell phones? Just who are they talking to? Maybe some of them are already working (before even arriving at work) but I bet many of them are talking to other friends and family who are, quite possibly, out in traffic too. How many of you have ever made a cell phone call because you were bored or lonely in your car? I have friends who will call me and announce that’s what they’re doing, calling me to get some company. The car is an insulator that keeps us from interacting and as naturally social creatures this isn’t a good practice. Less time spent in cars can mean more time spent with other human beings living life.
Reason #9 The 4 Day Work Week would mean a reduction in absenteeism
A recent survey found that 43% of respondents admitted to playing hooky last year. That is they stayed home from work even though they weren’t sick. Another day scheduled during the week to address the needs and wants of workers would give people more time to complete all sorts of activities. It could keep them from taking their own day off. It could also give people a day to schedule appointments like medical, dental, tax, attorney or other. A Four Day Work Week would mean fewer random interruptions when workers must leave the office to take care of these matters. Even the occasional summer day spent hiking with a child sounds like a good national exercise to me.
Reason #10 The 4 Day Work Week would increase productivity
Yes I said increase productivity.
In 1930 famed cereal maker W.K. Kellog had this to say about his decision to decrease his companies work week from 40 to 30 hours.
The efficiency and morale of our employees is so increased, the accident and insurance rates are so improved, and the unit cost of production is so lowered that we can afford to pay as much for six hours as we formerly paid for eight.
Peak oil and climate change could make for turbulent business waters ahead. This country needs more business leaders willing to navigate these waters not by burdening their workforce with limitations or restrictions but with a willingness to try new strategies. Ideas such as this one should be strongly considered by corporate America or maybe it’s time for the Federal government to revisit this issue through law. New ways of working really could benefit both businesses and employees. It’s important in the time ahead not to simply saddle the workers of America with the rising costs of energy and ecological destruction.
There are lots options concerning the number of hours a 4 Day Work Week could contain. Employees could work 10 hours a day and keep a 40 hour work week. Or they could simply eliminate an entire day and drop down to a 32 hour work week. In between is the idea of working 4 days a week, 9 hours a day. But regardless of how many hours people work, the important part to remember is that most tasks are going to get accomplished each week just as they did before. A recent survey by salary.com of over 10,000 American workers revealed that on average, we waste more than 2 hours each day surfing the web or making phone calls to friends. Might these distractions be activities that workers must be willing to trade for an entire extra day off to spend surfing on the Internet? I say that tongue in cheek as there are better ways to spend your new day off but the point is that the inbox is never empty and that important tasks could probably be completed in a shorter work week if time spent at work was all about work. A shorter work week would sharpen this focus and make the workplace more productive.
Reason #11 The 4 Day Work Week would give us more time for family
60% of Americans say they do not have enough time for family. To be sure we could change that statement to read, make time for family, because time is after all what you make it. It’s important to note that we work more hours than any other nation on the planet. But why? Why do we work? I think this question is at the heart of support for a shorter work week. We work so we can support our families right? But is more money and the always increasing amount of stuff that money buys really supporting our families? We have to pay bills but would your son rather have you at home or have a new flat screen television? 7 out of 10 teenage pregnancies are conceived at the home of the young girl between the hours of 3pm and 5pm. It is my view that what might be in my daughter’s best interest isn’t me working 50 hours a week so I can buy her a sweet sixteen car. It might be spending more time at home with my daughter talking to her about her future. A shorter work week would give this nation an opportunity to spend more time at home with our families.
Reason #12 The 4 Day Work Week would decrease labor costs
Long work hours increase the worker turnover rate which leads to more money spent on acquiring and training new employees. Employees who have almost as many days to spend on their own as days they spend working will be much happier and more loyal. These are employees who will work harder and stay longer at any given company.
Reason #13 The 4 Day Work Week would decrease operational costs
Depending on just how a company chooses to structure its 4 Day Work Week, any number of operational costs could be reduced. The energy savings from the climate control of unoccupied buildings could be enormous. Fewer security or maintenance issues could result from having a smaller number of people in the office each day. A shorter work week could mean more infrequent cleanings and less information technology service calls.
Reason #14 The 4 Day Work Week would mean a reduction in the cost of childcare
If a two parent household were to switch to a 4 Day Work Week then their childcare costs could be reduced by 40%. Childcare ranges in cost depending on the type care and the specific location in which a worker lives. Estimates range from $3,000 to $15,000 annually per child. A family spending $5,000 who could reduce the number of days their child is in care from 5 days to 3 could save $2,000 a year. This also means more of the child’s time spent with parents which fosters stronger families. It is important to note here that childcare that exceeds the normal 8 hour work day is more expensive. If both parents switched to 10 hour work days their childcare costs might not decrease.
Reason #15 The 4 Day Work Week would provide time for a transition into the informal economy
There are a lot of reasons why consumer culture is bad for us. It focuses not on people and their relationships to one another but instead on things, on stuff, on cheap plastic crap from Mal-Wart. It’s worth pointing out that not only is our habit of consuming mass quantities of junk toxifying our lives and our environment with all sorts of chemicals and pollution, it’s also using up a number of nonrenewable resources at an alarming rate. It seems reasonable to assume that we can’t continue on this ride of infinite growth for a whole lot longer. The coming era will be one of a decline in the availability of all sorts of resources we take for granted right now. Learning how to reshape and relocalize our lives will be an immense effort for both communities and the individuals living in them. Having an extra day each week to begin this process could prove invaluable. Need time to learn how to cook or garden? Have you always wanted to start a new cottage industry business from home? Maybe you’d like to be more activity in volunteer efforts in your community to address peak oil and climate change. This extra day could be our ticket as a nation to scaling back on our consumption while we reconnect to local life.
Reason #16 The 4 Day Work Week feels great!
I write this proposal not as an academic making a theoretical suggestion but as a participant in the new 4 Day Work Week movement. At the beginning of 2007 I renegotiated my contract with my employer and started staying home on Fridays. I now have more than a two day speed bump on the highway of American employment. I get to enjoy almost as many days at home each week as I spend working at my job. And it feels wonderful. Since making the change I have even taken a new job and was still able to continue with my shorter work week. 25% of U.S. companies already have some sort of policy towards alternative work schedules.
Telecommuting, cell phones and the Internet are just some of the other tools that can offer more flexibility to the outdated idea that we should all be at the office from 8 to 5 on Monday through Friday. I can tell you from experience that this feels great. I am able to spend time on projects that are important to me. I get to see my young daughter more. Lately it’s been a Friday bike ride together. And I have a chance to share my ideas with more time to write proposals like this one.
Changes require action. Our nation is at a point where we need change. Not politicians talking about change but an actual change in the way we live our lives. The 4 Day Work Week could be a catalyst for a change from a nation that lives to work into a nation that works to live. Come join me won’t you?
Jess said,
Thats awesome! Cool article
Red Hat Fedora Unbuntu Linux » Blog Archive » Growing Power-An Urban Agriculture and Education Center said,
[...] WI that claims to grow enough food for 2000 people on 2 acres. With a claim like that I source: Growing Power-An Urban Agriculture and Education Center, GroovyGreen.com – Start Today :: Save [...]
4days.org » The Birth of a Revolution said,
[...] and I feel it is time to do something about it. For the time being please take a minute and read The 4 Day Work Week by Aaron Newton at GroovyGreen.com. Hopefully you’ll find it as inspiring as I did. Viva la [...]
Kristina Summers said,
If I had a four day work week I wouldn’t have to scramble to get my blog done during lunch hour! Great article! I hope everyone reads it!
J said,
Great article … thoughtful ‘reasons why’
Now, how to get *employers* to not only read it but actually get on board!?!
Besides the [over-used?] argument about global competitiveness, for years now shareholders have not been content to earn a reasonable rate of return … they demand, so companies **must**, increase dividends year after year after year. Not only an unsustainable option but one that sure doesn’t allow for any employee needs.
Cheers
J
Bruno said,
What about the people who don’t go to a typical 5 day a week job?
Doesn’t that mean that those of us who work in retail, etc. have to be at work in order to have the stores open regardless of the day of week?
I think you are only thinking of those that work Mon-Fri and not of those that are hourly employees. People may not drive to work and sit there all day if they have it off, they might drive more to get to stores and other activities they do on their day off.
Chuck said,
Excellent article, For the most part it does apply to the 8-5 worker, but retail companies could just overlap shifts like they curently do and alternate achedules. 4×9, even 3×12. Many retail hire parttime, that leaves scheduling very flixible. Americans just need to get used to most companies being open 4 days a week. Gov, schools, banks are now M- thurs that would be excellent.
Relic said,
Not that I’m not for this, but… uhh.
I agree with reason, 11, 14, and 16.
What makes you think that just cause people have the day off doesn’t mean they won’t spread out errands? Or use it to take long weekend holidays… still driving. There go the first 10 reasons. (#4 is an exception, and this would ONLY work, if everyone decided to abide by it, and then not get on the roads during rush hour for what ever else they wanted to do that day.)
As for people not playing hookie… I doubt that’ll ever happen. And don’t even bother with the ‘they do it for appointments, and since they have a day off, then they could go argument’ If EVERYONE has a 4 day work week, that means doctors appointments that could only be scheduled during the work week now would have the same effin issue.
And as far as I’m concerned most companies are 365, running equipment anyways… so as far as cutting operational costs… I don’t really see that happening, because people don’t shut down for the weekends now. Why would that change too.
To successfully complete all 16 reasons, you’d have to personally convince every American that this could effect to follow a very strict set of rules. Best of luck with that, just what we need, more government intervention in our lives.
This all being said, the reasons I agree with are enough to convince me that it’s still a good idea. MORE personal time.
Barbara said,
I agree with all the reasons. We live in a very stressful society everything adds to it. Working 4 days would help us to recover and possibly help to alleviate many of the negatives attitudes we encounter on a daily basis.
I suggested it myself at work said,
I just finished a trial run of a 4 day work week with my partner, and it was fantastic, on my extra day off, I stayed home completed the work around the house and still had two days left to spend with family. The 4 day work week, does not have to change any hours of operation for companies, only the employees who work for them, it is more productive, less need for time off, less cars on the road, if national, can greatly affect the cost of fuel. Take this example, stores remain open, full time employees work 4 -10 hour days and alternate with other employees. In our case one works mon-thurs another friday through monday, even though we overlap 3 days a week, two days a week, we are off the road saving gas, maintenance, wear and tear, emissions, etc there are always going to be those who continue to drive on the third weekend day, but, if even half didn’t we would still save, and I don’t know but at the cost of gas now, I don’t plan on driving any more than I have to.
Gregory Wright said,
Another good article about the great value of the widespread adoption of the four-day workweek schedule is
“More Time, Less Carbon: the 36-Hour Four-Day Work Week,” by Gregory Wright.
It’s on the site of the Take Back Your Time campaign (www.TimeDay.org) at
http://www.timeday.org/news-vol5issue1.asp (and http://www.timeday.org/news-vol5issue1.asp#03).
The political-economy of your pain at the pump « Re: The People said,
[...] week from 40 hours to 32 hours, and from five days to four days. According to an article posted by Aaron Newton: The idea of a shorter work week is not a new one to anyone old enough to have lived through the [...]
Debbie said,
I bicycle to work,, so, I’m already saving the planet. It’s fun, it’s healthy and I don’t remember how much I paid in gas my last fill up in a car that I use to go to the grocery store and take to appointments or visits not accesible by bicycle. A four day work week would be a nice perk in a job, but shouldn’t be mandatory.
Bill Rowlands said,
This is a really stupid article. Every company has fixed costs whether people work 4, 5 or 6 days a week. The only way to be economical is to have people work as much as possible to minimize the cost per hour worked of those fixed costs.
If people worked less a business’s costs will skyrocket. Obviously the person who wrote this article never ran or managed a company with more than 100 people.
browlands@lynxpm.com
MIke said,
A four day work week would be great. I’m more than willing to do four productive 10 hour days compared to what I’m doing now, with the benifit of lowering my use of gas/oil and the companies reduce heating/cooling/electrical costs. Really when you think about it most of us come to work on Friday and do nothing but watch the clock waiting for the weekend. The things I could do at home if every week Friday or Monday were a day off.
The argument about people spending the extra time off driving around doesn’t hold water for me. Sure it will happen, but once gas hits $7 a gallon we’ll see who spends there extra time off burning up the road.
The comment from Bill Rowlands leads me to believe that he’s not a very effective manager of his 100+ staff. Bill you can stagger your work force to suit the needs of the company/customer and still have your employees working the god decreed 40 hours.
I dont see where the companies fixed costs would be impacted at all. Unless were talking about reduced electrical/water costs two days a week. Having employees work as many hours as possible hits a wall once time and half kicks in. Your buget for payroll goes up and unless you have a contract with overtime dollars available you’ll start eating into profit. Also the typical employee after 40 hours become very unproductive
billy: the doctor :: we were not meant to be ants said,
[...] http://www.groovygreen.com/groove/?p=2223 [...]
Mark said,
Please describe for me the 40% savings in oil production, Every way i “slice and dice” I
only get a 20% savings. On a 5 day work week each day is equall to 20% of the total usage.
So if you takeaway 1 day it would be a savings of 20%, or am i missing something.
Math_Required said,
Lets do simple math here people. 4×10=40. 8×5=40. It doesn’t matter which way you cut it, the office would still be open 40 hours per week. Therefore still generating energy 40 hours. If you stagger employees Monday-Thursday and Tuesday -Friday you are actually generating energy 50 hours a week keeping the office open. Yes it is great to have a 3 day weekend but lets face it, it is only a very small benefit to the employee, no benefit really to the employer. Lets say you drive 20 miles round trip to work and you have a vehicle that gets 20 mpg. You will say at the current gas prices of 4.09 a gallon each week with a total of 52 weeks. Thats a savings of 212 dollars. Divide that by 12 months it saves you a whopping 17 dollars a month. Don’t get me wrong you are also saving on emissions and traffic but like someone else stated you will be doing trips on your day off. 17 dollars is 17 dollars and in the current economic crunch we have be forced into it is a savings, but is it worth your company business to shut down for an entire day to save the employee 17 dollars? This especially true for goverment offices where people are used to being able to pay bills, etc. Just food for thought
Lilipie said,
What a joke…
What do you suppose they will be doing on their day off. Running around in their car?
Putting on more milage than a trip to work.
tennille said,
http//:www.4days.us
I found this neat site attempting to help promote the 4 day work week with armbands and stickers. might work??
Good Bye 4 Day Work Week. Indonesia Pushes for 7 Day Work Week to Save Energy. » GroovyGreen.com - Start Today :: Save Tomorrow said,
[...] Four Day Work Week post has generated a lot of traffic and discussion at our site, and has appeared in other sites [...]
lee said,
I would rather have 4 days off, and work 7. 7 days of work, followed by 4 days off is my ideal life schedule. I’ve practiced this schedule several times, and found it to be AMAZING, fulfilling in both my professional, and personal life.
http://www.leefernandes.com/blog/blog/Entries/2008/7/14_Information_Era_Workweek.html
4-Day work week? | jungle [8] said,
[...] and actually increase American productivity while increasing overall health and quality of life. Aaron Newton from Groovygreen.com, presents a detailed list of 16 reasons why changing the standard American [...]
Women In The Green blog » Blog Archive » And now for some happy global warming news… said,
[...] of encouraging news and even tips on approachaing the topic. I especially like this article from Groovy Green! Posted in Global Warming in the News, Save Green by Going Green, Simple Ways to Save the [...]
Team Taskmaster mobile edition said,
[...] In addition to reducing fuel costs and electricity usage, a four-day plan could actually improve your workplace. Robert LaJeunesse has argued that a shorter workweek is correlated with higher productivity. That’s supported by a recent Brigham Young University study that found a four-day work week may increase job satisfaction and productivity. Aaron Newton also points out that a four-day workweek could reduce absenteeism, decrease labor costs, and improve both employee morale a…. [...]
4 Day Work Week: Schools as Catalyst? » GroovyGreen.com - Start Today :: Save Tomorrow said,
[...] Aaron’s post predicted, morale and productivity improves with a 4 day work week. Teachers and students are happier, [...]
mark said,
unfortunately many companies and states are doing teh 4 day work week all wrong . The answer is not 4 –10 hr days . 10 hrs plus commute time is too long a day and will kill this great concept. A regular year is 2080 work hrs. subtract holidays, vacation and sick leave and you get about 1774 actual work hours . Now take a 4 day 9 hr work day, (1872 hrs) reduce annual and sick leave but add in the 52 you get by having every week. Then eliminate the monday/friday holidays and you nearly have a even trade with 1764 work hours . Now that is a plan I could embrace.
Brian said,
as I have easily noticed on the weekend it is harder to get thing done work wise (because stuff still happens on the weekend). If the weekend was lengthened would that not just make it even harder to do this. Plus would that not mess with inflation, less work =less money = less money being spent on items= demand for lower prices = lower prices = either richer people because thing cost less or lower wages cause the cost of living has gone down = well then we’re kinda at the start but more like at the less money thing and soon all hell will break lose and before you know it well have WW3 because major corparaton need someone to blame for all the caos, then well abliavate anyone we want and well somehow end up at the start and someone will come up with this idea again and it’ll start all over again. I would like more party time but I’m afaid I have to think of the future of my kids and future gandkids and what type of world I want them to live in. Go watch the movie Idiocracy and you’ll see what I’m mean.
Sheila said,
Hey,
I wanted to see if I could get your quick help. I’m not sure if you’ve heard, but there’s a movement of citizens inspired by the presidential campaign who are now submitting ideas for how they think the Obama Administration should change America. It’s called “Ideas for Change in America.”
I’ve submitted an idea and wanted to see if you could quickly vote for it. The title is: a 4 day work week will to reduce unemployment by 75%. You can read and vote for the idea by clicking on the following link:
http://www.change.org/ideas/view/a_4_day_work_week_will_to_reduce_unemployment_by_75
The top 10 ideas are going to be presented to the Obama Administration on Inauguration Day and will be supported by a national lobbying campaign run by Change.org, MySpace, and more than a dozen leading nonprofits after the Inauguration. So each idea has a real chance at becoming policy.
Thanks for the support,
Sheila
Kim said,
I currently work 4-10’s and it makes your work-week feel so much shorter. I’m off on Mondays, and now I’m not totally dragging by Thursday. However, my boss can’t seem to adjust to this and is going to force me to go back to 5 days per week. I have a very long commute too. What a step in the wrong direction!